T-50 Overhaul

Got a problem? Let the Brotherhood help!

T-50 Overhaul

Postby cedu » Thu Apr 03, 2014 12:15 am

Used this not long ago, thought you guys might need this at some point too.

- From Ronny (Club4AG)

Rebuilding (synchro's/bearings) t-50 toyota transmission.

Part #'s :
04331-14030 - Trans gasket kit (includes output shaft & input shaft seals)

90365-30020 BEARING, x 1 - Front - Input shaft bearing
90361-06047 ROLLER x 12 - Input/Output shaft roller/bearing
90363-25017 BEARING, x 1 - Rear - output shaft bearing
90369-30027 BEARING x 1 - Center - output shaft bearing
33365-14011 KEY, SYNC x 3 - 1/2 synchro hub keys
33368-20012 RING, SYN x 2 - 1/2 synchro's
33367-14010 RING, SYN x 2 - 3/4 synchro's
90365-30015 BEARING, x 1 - count shaft center bearing
90365-20004 BEARING, x 1 - front countershaft bearing
90365-20001 BEARING, x 1 - rear countershaft bearing
33394-14010 KEY, 3&4 x 3 3/4 synchro hub keys
33366-14010 KEY, 5&R x 3 5/Rev synchro hub keys
33367-14010 RING, SYN x 1 - 5th gear sychro
33363-14012 SLEEVE, T x 1 - 1-2 shift collar/synchro hub
33364-14010 SLEEVE, T x 1 - 3-4 shift collar/synchro hub
90364-37002 BEARING, x 2 - 1st & 2nd gear brgs
90364-37004 BEARING, x 2 - reverse gear brgs
90364-27003 BEARING, x 1 - 5th gear brg

Last part on Order
?????-????? x 1 - Output shaft end bushing

Transmission pictures, steps and other useful info:

1. Transmission. (cleaned up, except for parts of the sr-5 bell housing which is going in the trash most likely)
Image

2. Bell housing.
Image

3. Bell housing removed: Pretty simple to do. Remove throw out bearing, clutch fork and intput shaft collar (4 - 12mm bolts inside bell housing). Then you simply unbolt the 7 (or maybe its 8) 14mm bolts holding the bell housing onto the trans.
Image

4. Extension housing.
Image

5. Speedo gear removal/removed: Also relatively simple, but kind of delicate. Undo the 10mm bolt and remove the holding tab. Get some sort of penatrating lubricant (PB blaster in my case) and give a shot/drop where speedo gear goes into the Extension Housing. Get a flat tip screwdriver (med-large) and gently pry upwards while wiggling towards and away from the screw driver - be VERY careful as the aluminum housing for the speedo gear is pretty brittle/delicate and will chip if too much force used. Once it's part way out you won't be able to pry anymore, put the holding tab and bolt back in (facing away from speedo gear) and use it as a new pry point and continue. It'll come out - eventually.

Tip: if you have a spare speedo cable or a busted one its very easy to thread onto the end of the speedo gear and makes wiggling/tugging/removal much easier.
Image

6. Speedo gears and gt-s speedo gear p#
Image

7. SR-5 speedo gear - note the #20 stamped on it, it's the # of teeth it has and determines how fast the cable spins - thereby how fast the speedo shows.
Image

8. GT-S speedo gear - has a #19, spins the cable just a little slower. Since the differential ratio is lower in the gt-s than the sr-5 (ie more revolutions of motor required to make the vehicle move the same speed) it's necessary to install a different speedo gear to match the gt-s gearing.
Image

9. Shift lever stops/pins: Remove both from extension housing, easy to do, weren't in there all that hard either. Just a quick tap with an open palm on a crescent wrench and they were loose and spun right out.
Image

10. Reverse sensor: Remove, just use a 19mm deep socket. Behind/beneath the reverse sensor/switch is a ball bearing - remove it using a magnetic finger/wand/stick. (or flip the tranny over, it'll probably come out - just don't lose it!)
Image

11. Remove extension housing: here's where the shifter stops/pins being removed helps, by rotating the shifter cup/bucket/intermediate shaft in the extension housing you can slide the extension housing back and off without much difficulty. (no need to knock out the spring pin/clip in the shifter socket/bucket and sliding the shaft out - too much work)
Image

12. Remove shift shaft check ball's & springs: Roll transmission upside down, remove the two 10mm bolts and plate. The springs you can pick up with your fingers, but the check balls will be down lower and you'll need a magnetic finger/shaft to get them out (as with the reverse switch ball. you can flip it over - just don't lose them!).
Image

13. Remove case half: Remove all 12mm bolts (11 total I think), tap case gently up and away from other half with a brass hammer or rubber mallet and it should come free.
Image

14. Case removed - looks pretty cool, the input/output shaft and balance shaft will lift right out without having to do anything with the shift forks. Just remember, remove balance shaft first.
Image

15. Case Cleaned.
Image
<br /><br />

16. Gears - input/output shaft & balance shaft removed.
Image

17. 1st gear synchro
Image

18. 2nd gear synchro. - see how the engagement is worn/damaged, I will probably replace this gear - and maybe the shift collar as well (if damaged)
Image

19. 3rd gear synchro.
Image

20. 4th gear synchro.
Image

21. 5th gear synchro.
Image

22. Reverse Gear - notice how chewed up the engagement for this gear is? That's because there is no synchronizer gear/ring for reverse and whoever drove on this trans before me was probably jamming it into reverse, possibly while still moving/rolling forward. But, since it is reverse, I'm not too worried about it and probably won't replace it.
Image

23. Input shaft - pulls right out with ease, and the roller bearings just fall out.
Image

24. Input shaft - shaft partially dissassembled, front portion of output shaft dissassembled (3rd gear, synchro, 3-4 collar, clips, keys) Unfortunately I need a press and bearing remover to pull the bearing off the input shaft for replacement.
Image

25. Output shaft - cleaned up after front dissassembled.
Image

26. Speedo driver gear - on rear end of output shaft, removed.
Image

27. Counter shaft - front bolt and bearing/shaft retainer clip.
Image

28. Counter shaft - rear clip.
Image

29. Some of the parts needed have arrived. Of the bearings in the red boxes - only the three for the input/output shaft and the middle bearing (with dimple, for countershaft) have arrived, I will be ordering the two outer countershaft bearings.
Image

30. Puller/Tool used to remove the outer bearings on the countershaft. On the front bearing the puller tool will slip right into the opening for the retaining bolt. So what I did was grab a spare stud from the side of a largeport block (the same studs that hold alt/ps/ac/motor mounts) and used that as a press point.
Image

31. Front counter shaft bearing dissassembled (order of installation from left to right - washer/race goes down first, then bearing assy, then main bearing race - which is held in place by a bolt)
Image

32. Front counter shaft bearing again - hopefully you can make out the part #, probably can pick 'em up aftermarket with a cross reference/guide.
Image

33. Front counter shaft bearing again (shown in order of installation)
Image

34. Rear counter shaft bearing. (order of installation - washer/race, bearing assy, main bearing race, then retaining c-clip)
Image

35. Rear counter shaft bearing - part #.
Image

36. Partially disassembled countershaft.
Image

37 - Trans gasket kit
Image

38 - Dissassembled output shaft - You'll need a press and a small and medium/large bearing seperator. When dissassembling be sure not to loose the three small ball bearings/locking balls as they can fall out and get lost fairly easily. Also the 3/4 size clips that are removed will bounce right off the floor and into no-mans land if you're not careful, I'd recommend laying down a nice fluffy towel to dampen the impact as you don't want to loose those either.

(parts start at top Left and go in order of dissassembly from the end of the output shaft all the way to 2nd gear.)
Image

39 - Output shaft end bearing
Image
cedu
 
Posts: 4
Joined: Wed Apr 02, 2014 11:58 pm

Re: T-50 Overhaul

Postby cedu » Thu Apr 03, 2014 12:15 am

40 - Output shaft center bearing
Image

41 - 1-2 shift collar - 2nd gear side
Image

42 - 1-2 shift collar close up (I will be replacing it, too much wear/damage)
Image

43 - Input shaft - new bearing installed
Image

44 - Input shaft bearing
Image

45 - Counter shaft center bearing installed
Image

46 - Counter shaft center bearing
Image

More to come... Close up of bearings provided so the mfg. #'s can be seen and hopefully used to put together a parts list from aftermarket for a less costly repair (as I have spent quite a bit thus far and more to go)

47 - more parts.

Image

48 - Countershaft assembled w_new bearings.

Image

49 - Assembling Outputshaft - 2nd gear _ synchro hub installed.

Here's where the fun starts, when reassembling the output shaft there are 3 small ball bearings which sink into the output shaft and hold certain pieces steady. When pressing it together you need to keep everything lined up and the locking balls in place. What I did was grease the cup on the output shaft to hold the balls in place, and when pressing everything together I held everything up in place with a finger or two - no worries about crushing a finger, it's fairly easy to do and there is enough room to get you're finger out well ahead of time...

Image

50 - Assembling Outputshaft - 1st gear & center bearing installed.

Image

51 - Almost assembled Outputshaft & Assembled Coutershaft.

Just need to put 3rd gear and the 3/4 sychnro hub together and on, and also the speedometer drive gear.

Image

Still waiting on the new 3/4 shift collar/sleeve/synchro hub...

52 - Removing GT-S bellhousing.
Image

53 - Removed GT-S bellhousing, degreasing.

Image

54 - Removed SR-5 bellhousing, T-50 from the GT-S swap.

Image

55 - The car, not driveable unfortunately

Image

56 - Cleaned bellhousing.

Image

57 - Installed Speedo drive_spline gear
Image

58 - Installed 3-4 Synchro hub_sleeve

Fairly easy to install - a large enough socket and you can tap it on gently with relative ease if the splines have been cleaned.
Image

59 - Input shaft _ 4th gear, needle bearings

I put some synthetic grease to hold the needle bearings in place and to provide some lubrication at idle once the trans is installed.
Image

60 - Input shaft _ Output shaft assembled

Really easy to do - hold the input shaft straight up so you don't loose the needle bearings and drop the output down/into place.
Image

61 - Speedo gear disassembly
Image

62 - Speedo gear assembly
Image

63 - Input-Output shafts _ counter gear in case
Image

64 - Counter gear center bearing, notch lined up

You have to line up the notch for the center bearing:
1. It keeps the bearing center bearing centered (where it should be, duh)
2. The case halves won't go together correctly if its not.
Image

65 - Case assembly test fit
Image

66 - New extension housing end bushing
Image

67 - Installed Extension Housing
Image

68 - Shift Stops
Image

69 - Speedo Gear
Image

70 - Reverse sensor and check ball
Image

71 - Shifter Check Balls and Springs
Image

72 - Installed Bell housing, Shift Fork and Throw Out Bearing
Image

73 - Assembled Transmission
Image

74 - Installed Transmission
Image

75 - Tip,Trick cover shifter cup with tape when installing
Image

It's FINALLY all done and in - test drives good. I've got to get used to having synchro's that work, I'm trying to force it over and in when it doesn't need to be... :D
cedu
 
Posts: 4
Joined: Wed Apr 02, 2014 11:58 pm

Re: T-50 Overhaul

Postby Chaycore » Fri Apr 04, 2014 8:49 pm

this is real good man!

thanks for sharing